![]() |
Re: House Projects
3 Attachment(s)
Got Dayum, these people work fast.
|
Re: House Projects
How many square ft is it again? Looks pretty decent sized, I would bet by the end of next week it should be close to getting a roof, or maybe even have plywood on the roof depending on how many guys are on the crew.
|
Re: House Projects
I forget the exact numbers. Something like 2000 on the main level, then the same in the lower minus however much the wine cellar and mechanical room is. So maybe like 4000 total, but 3600 finished?
|
Re: House Projects
Yea, probably two weeks then. Depends on if there are any vaulted ceilings, a hip roof vs a gable roof, etc. That stuff always takes a while to hand frame.
|
Re: House Projects
Yeah it has a hipped roof, and great room is a vaulted ceiling.
|
Re: House Projects
dayum 3600 finished feet. rock on!
|
Re: House Projects
Very nice! Always fun to see all that planning start to come together!
I have a house project in progress too. Our dishwasher broke and trashed all of our hardwoods, so I am putting new ones in. Much nicer than the old ones! Old hardwoods: http://a7.sphotos.ak.fbcdn.net/hphot...80662135_n.jpg Ripped up: http://a8.sphotos.ak.fbcdn.net/hphot...80353939_n.jpg http://a7.sphotos.ak.fbcdn.net/hphot...52414175_n.jpg |
Re: House Projects
New hardwoods going in, they are laminate but a new high definition printing with piano finish, they look amazing!
http://sphotos.xx.fbcdn.net/hphotos-...10195335_n.jpg And the new dishwasher in the shot too. http://sphotos.xx.fbcdn.net/hphotos-...04450447_n.jpg |
Re: House Projects
ha, yea, that will probably be closer to 3 weeks until they are putting doors and windows in it I would think Brandon.
|
Re: House Projects
These are two of them 5 or 6 or so we are going to be looking at.
http://msp.themlsonline.com/details,...s,4108674.html http://msp.themlsonline.com/details,...s,4131095.html |
Re: House Projects
That first one is tiny, the foundation size is 660 sqft, so they are lying about it being 1500 sqft. They are probably including the deck. Second one looks like a nice find!
|
Re: House Projects
^Good eye I didn't notice that! I'll have to make sure to ask about that.
I am trying my best to stay within the Centennial school district with minimum 3 bedrooms and 2 stall garage, which kind of limits our choices. Dominic is only about 2-3 years from being in school, so that is one of our top priorities. Edit: This one looks pretty decent as well. http://msp.themlsonline.com/details,...s,4087100.html I like the fact it has the bar, storage shed, and playground. Now I really need to talk to our credit union and see what we can get approved for as far as a loan. DOES ANYONE HERE HAVE ANY EXPERIENCE WITH VA LOANS?? |
Re: House Projects
I have looked in to them before, but VA loan usually is higher interest rate than normal and there are hoops to jump through. I compared them both times I bought houses and regular loans were better each time.
That last one looks really nice too. Is a short sale, but that is the way I would go too. |
Re: House Projects
i dont think the first house is lieing. 660 on the main floor. 528 underground. and im guessing the extra 300 or so is in the attic. might be converted for a bedroom. when i was looking at houses last year this was the case 90% of the time with the small base footage houses.
Quote:
|
Re: House Projects
5 Attachment(s)
They are making some amazing progress. Every day we swing by and are amazed! The entire main level is pretty much framed. The roof is framed. It's starting to look like a house!
|
Re: House Projects
Wow they are moving. I wonder what kind of hours they work and how many guys they have
|
Re: House Projects
looks good and yeah really quick going up
|
Re: House Projects
We usually notice 2-4 guys. Not sure when they start but they seem to leave around 5ish
|
Re: House Projects
Got these lights for the front of the house. Kinda cool, never seen anything like it before.
http://www.youtube.com/watch?v=j5QQ8NKuiQs http://www.youtube.com/watch?v=j5QQ8NKuiQs&hd=1 |
Re: House Projects
6 Attachment(s)
Roof is on. Upper level is fully framed (archways installed as well). Windows and doors are installed. We were told they will be pouring the basement floor tomorrow, and framing the basement Friday. Still amazes me how fast they work.
|
| All times are GMT -5. The time now is 12:33 AM. |
Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.