![]() |
Re: House Projects
55" Toshiba LED 240hz 3D TV as the main living room TV viewed from the couches, and a wall-mounted 40" Samsung LCD TV as the secondary TV behind the living room bar! I'll go snap a few pictures in a bit...
Neon beer sign coming soon. |
Re: House Projects
|
Re: House Projects
Very nice!
|
Re: House Projects
The TV behind the bar needs a wire tuck! Looks good though
|
Re: House Projects
Baller son!!
|
Re: House Projects
Quote:
|
Re: House Projects
Just saying it would suck to have a drunk kid rip it off the wall cause the cord was sticking out. Good luck!
|
Re: House Projects
looking good, glad the mount worked out for you!
|
Re: House Projects
Quote:
|
Re: House Projects
10 Attachment(s)
Update for this week. The garage floor and front porch cement have been poured. Ceilings have been painted, initial coat of paint on the walls as well. The has all the doors hung, and is 95% done with the trim. The main level has about 80% of the doors hung, and about 30% of the trim installed. I'm assuming they'll finish up the trim work tomorrow, as well as take delivery of all the cabinets :)
Also, I went beyond their little excavation fence and started clearing out the mess of a back yard that was completely packed with various Poplar, Willow, and Bamboo all over. Cleared it out so it's much more open now. There's still a few more we may remove but it's a huge difference already as it is. |
Re: House Projects
yard clearing pics.
Basically what it looked like before (this area is staying wild) http://a7.sphotos.ak.fbcdn.net/hphot...90993834_n.jpg After http://a1.sphotos.ak.fbcdn.net/hphot...07386592_n.jpg http://a4.sphotos.ak.fbcdn.net/hphot...14481284_n.jpg http://a7.sphotos.ak.fbcdn.net/hphot...31868857_n.jpg |
Re: House Projects
Looking good! Bamboo doesnt grow in mn though hahaha.
I just got done with the last coat of paint on the bathroom, cleaned up all the plastic, tarps and vaccumed, almost done! Just need to seal the tiles this weekend and install trim and towel holders. Shower door and toilet are in. My stupid phone memory stick stopped working today, so I sure hope I didnt lose all my pics ive been taking with it over the past few months.. Ill check tomorrow. Ill post pics by this weekend too. |
Re: House Projects
Quote:
Looks like a really nice house, I'll have to visit sometime after our weddings are over. |
Re: House Projects
It's bamboo looking stuff, I dunno the exact species I guess Lol. Yeah Andrew you'll have to come check it out sometime. We might have an extra room if you need a place to sleep while you're here :)
And yeah Peter I'm excited to see the pics of your new poop room!!! |
Re: House Projects
10 Attachment(s)
Update for this week:
Trim is fully installed, and varnished. All cabinets are stained, sealed, and installed. All bathroom counter tops (cultured marble) are installed. Final coat of paint is done in the house Siding on the front of the house is primered and mostly installed. They also repaired some siding on the rear we noticed was damaged. Also, since the garage is only minimally taped (only as much as required by fire code), my cousin and I did more mudding to it, and plan to paint the garage in the next week or so. He's a professional painter so he managed to get his hands on 10gal of leftover primer, and 10gal of a light beige paint for free. So that's the color it'll be painted I guess, can't argue with free! We also locked in a rate at Wells Fargo for a 30yr fixed mortgage at 3.625% interest, can't beat that shit. Builder is saying they want to try and close first week of June, but something tells me that's a little aggressive. I'm guessing mid June myself. Pics attached. |
Re: House Projects
Wow, getting close now!! I think they could have it done before the end of the month pretty easy. Mostly finishing touches and flooring now.
|
Re: House Projects
Flooring, lighting, install electrical outlets and switches and circuit breakers, plumbing fixtures, tile shower, appliances, kitchen counter tops, driveway, landscaping, garage doors, finish exterior siding and paint it, exterior stone, install air conditioner, install furnace, appraisal, final inspection. I dunno seems like a lot yet, but then again they never seize to surprise me.
|
Re: House Projects
That list right there should only take about 1.5 weeks, if they schedule properly...I think you'll be in there soon. I've worked on plenty of houses where the schedule was much tighter. It's looking great!
|
Re: House Projects
9 Attachment(s)
Little update for this week.
- Master bath is fully tiled (floor and shower) and grouted - Upstairs spare bath, downstairs bath, and garage entrance/mudroom/laundry room all have vinyl flooring installed. - Kitchen and Foyer have the Acacia hardwood laminate flooring installed - Garage doors installed - Stairs installed in the garage, although they installed them backwards. - My cousin and I and a buddy sprayed primer on the walls and ceiling in the garage on Friday. Started rolling paint on the walls in there today, got about 1/4 of the way done. - Laminate kitchen counter tops are installed. - Laminate laundry room laundry tub counter top is installed. - Fireplace tiled and grouted. - Lights are all delivered to the house, assuming they will be installed this week. - Garbage disposal delivered to the house (kinda weird but we had to supply that). - Kitchen appliances scheduled to be delivered this Friday |
Re: House Projects
Nice.
|
| All times are GMT -5. The time now is 09:04 PM. |
Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.