started on the lines today
10an for the oil cooler

new 8an line for the fuel rail. I am going to get a extra 90 fitting for the afpr to make the line shorter

also drilled the baffles out of the valve cover so I can put the 2 90 10an fittings in. going to tap and put in s.s. alan screws to hold the baffles back in

the baffles are soaking in degreaser right now
