since I moved into my new house, I've had tons of projects going on as well. First thing was getting the lawn in order before fall. Then we had to build out a the master closet as we had the wire closet organizer and they collapsed shortly after we moved in. Ended up going with a custom closet. Lastly, the garage needed to get finished before winter so I could get it heated. Here are some pics from the garage. I didn't think to take pics initially, so I don't have great progress pics, but here are some at least.
Initial garage (trying to clean up the previous owners wiring):
I added 9 recessed lights, 8 outlets, and a ceiling fan. Along with that I wired in four in ceiling JBL speakers all to my receiving by the door.
Some Sheetrock up after doing some insulation.
One of the speakers:
Some of the ceiling:
Some of the walls:
A lot more wall:
Some wide angle shots:
Ceiling is done!
At this point, I have very little rock left. All lighting in the garage is EcoSmart "Cree" LED bulb/fixtures. Just need to get the ceiling fan up and finish a couple other things. The garage floor will be finished in the spring and hopefully get a 4-post lift in the 3rd stall after getting some final measurements.