View Single Post
Old 10-21-2012   #30
DSMINMN
Mitsus for days!
 
DSMINMN's Avatar
 

Join Date: Dec 2009
Location: Wadena, MN
Drives: '08 Chrysler 300C
Posts: 1,521
Send a message via MSN to DSMINMN Send a message via Yahoo to DSMINMN Send a message via Skype™ to DSMINMN
Re: Project winter beater

Engine and trans. are in.







I went to our shop today with plans to just clean the main engine wiring harness. lol I was wrong. A few buddies of mine showed up, and by 10 or 11 tonight or "last night" (technically), everything was together and in, even though we did run into a little problem with my new throwout bearing completely the wrong one.



By the pictures I obviously still have to connect the wiring, fuel lines and get the battery set up. Not to mention mounting a radiator that I still need to source, and all the body parts. That will come in due time though.

My plans for tomorrow are to have the lower control arms and outer tie rods replaced Then get the shafts in and chip gaurd the wheel wells. Maybe I'll be able to get the interior back together too. lol

Thanks for looking!

Last edited by DSMINMN; 10-21-2012 at 04:22 AM..
DSMINMN is offline   Reply With Quote