MitsuStyle MitsuStyle

Go Back   MitsuStyle > The Homefront! > Project Talk

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 08-19-2009   #11
TkrPerformance
 
TkrPerformance's Avatar
 

Join Date: Oct 2003
Location: edward lake
Drives: toaster
Posts: 6,431
Send a message via AIM to TkrPerformance
Re: the evo 3 swap parts are coming

got the rest of the piping today from craig. so I got the 2 dump tubes made up and on the tial 38's

got the hot side for the turbo today so the down pipe could be started. Kevin came over and helped out huge with fabing up the down pipe. it is all tacked right now I just have to weld it all together in the morring. Put the 2 bung in it for the o2 and wide band and wrap it.
TkrPerformance is offline   Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -5. The time now is 12:53 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.