MitsuStyle MitsuStyle

Go Back   MitsuStyle > The Homefront! > Project Talk

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 04-27-2010   #11
Pushit2.0
15min late to the world
Re: 91 Galant VR4

There has been progress over the last 3 weeks. I had surgery on my noise, a septoplasty and something else the begging of this month. This was done to help with sleeping at night. Here is a link: http://www.facialbeauty.com/Nasal%20Septoplasty.asp

The engine is back in for final mock up of the major parts, I am to the point were I need to save up a ton of cash to finish this project. The major parts I need: Shep stage 4 or equal, twin disk clutch, slicks or drag radials and rims, rear window, hood, fuel pump, filters, regulator, 1/2 size radiator.

We bent up the front break lines and bled the system, added straps to hold the water to air IC onto the turbo and TB, painted the dash, fabricated the down pipe and WG tump tubes, finished up the aluminum rear sub frame mounts, mounted the drive shaft, weighed the car again, and revised my list of stuff to complete the car. Some day I hope to be done with this project.

And swifty you looked at the car for at least 3 hours, what did you not look at?

~John
__________________
Moon taxi: 9.45@156.9 mph 41psi 2011... Letting people down sense 2012.

Last edited by Pushit2.0; 04-28-2010 at 01:42 AM..
Pushit2.0 is offline   Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -5. The time now is 02:40 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.