MitsuStyle MitsuStyle

Go Back   MitsuStyle > The Homefront! > Project Talk

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 03-30-2013   #11
99gsxjoel
 

Join Date: Mar 2011
Location: Minnesota
Drives: 1999 GSX
Posts: 259
Re: joel's build

Big update tonight.
Installed the clutch and trans, and dropped it in the bay
Got all the wiring and vacuum lines hooked up. Starter and axles installed. It is getting close to being ready to start.

To do list.
Transfer case
Down pipe
Oil feed and return lines
Radiator
Intercooler
And fill all the fluids.
Thanks Nick for all the help.

__________________
99gsxjoel is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -5. The time now is 12:57 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.