MitsuStyle MitsuStyle

Go Back   MitsuStyle > The Homefront! > Project Talk

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 06-13-2016   #26
bramagedained
 
bramagedained's Avatar
 

Join Date: May 2010
Location: KY/MN/Afghanistan
Drives: EVO IX SSL
Posts: 413
Re: My "new" car/project.

I'm really shit at keeping with the updates it seems. I'll have pictures up later tonight. I had a driveshaft made on Friday. Was ~$280 with tax from Proven Force. That was the last missing piece to take it for a drive.

It's getting close.

My to-do list:

Check all new fitting connections. Fuel/trans/brakes/coolant.

Set preload on front wheel bearings-Need to buy cotter pins.

Bleed Brakes.

Adjust Booster->MC pushrod.

Re-Install exhaust.

Wrap up wiring. Dome light and +12v to cigarette lighter for cell charger.

Sand the seam sealer on rear fender arches and paint bare metal.

Modify carb. -Remove and drill two holes in butterflies for idle.

Set timing. I need to buy a timing tape for the damper.

Mount battery box.

Make access hatch for fuel cell. I have sheetmetal and piano hinge.

Alignment.

Proceed to coat quarter panels with rubber.
bramagedained is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -5. The time now is 12:41 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.