MitsuStyle MitsuStyle

Go Back   MitsuStyle > The Homefront! > Project Talk

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 12-29-2017   #11
Mark Leasure
 
Mark Leasure's Avatar
 

Join Date: Aug 2006
Location: eagan
Posts: 898
Re: Mark's 1G Winter Projects

The cage is done! I'll be getting it certified next month. It's been an awesome project. The seat mount and belts are done too.





I also removed a little more than 10 more pounds of metal from the front driveshaft carrier bearing mount and supporting structure from driveshaft tunnel. This sucked to remove, i was drilling spotwelds for 3 to 4 hours! It was well worth that time for that much of a weight reduction. I'll need to get this thing on corner scales to see what it comes out at.



To remove the driveshaft support structure I had to cut out emergency brake cable bulkhead from the floor. I got to use my bead roller and made a patch panel, and plug weld at all the areas where I accidentally drilled through while removing the spot welds. I also stitch welded back in the floor section I cut for the tube that intersects it.

__________________
Slowest: 2017 Corvette Z06 - Z07 Trim
Fast: EvoIX SE – Blouch 2.0xtr turbo – E85
Faster: Evo IX MR –PTE6266 – E85 –823WHP 9.90@147
Fastest: 92 Talon AWD – 8.14 @ 171 MPH
www.maperformance.com

Last edited by Mark Leasure; 12-29-2017 at 05:47 PM..
Mark Leasure is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -5. The time now is 02:06 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.